Chris King R45 Rear Hub - Disc - QR 10x135mm - 32 Hole

Instead of RRP*** 599,00 € Our price:
452,90
You save 24%
Free Shipping1. Price incl. VAT
for shipment to Germany.

Availability: please select.

  • Description
  • Fact Sheet
  • Availability**
  • Ratings (0)

Description of Chris King R45 Rear Hub - Disc - QR 10x135mm - 32 Hole

The high performance R45 Disc hubs are built to meet the requirements of the world’s most demanding road and cyclocross riders with the long-term performance, durability, and serviceability that you expect from Chris King components.

Like all R45 Hubs equipped with the same 45 point RingDrive engagement system and exceedingly smooth in-house made bearings. As with every King bearing, these sealed bearings are made in-house in Portland, Oregon and individually hand-checked for precision and smoothness. This proprietary bearing design allows the developers to place more rolling elements per bearing meaning greater durability and precision. R45 bearings also feature lightweight, low-friction seals for fast rolling and can be easily serviced at regular intervals using only a single 2.5 mm hex wrench and penknife.

Clearance: R45 disc rear hubs can be used with at least 2-cross spoke lacing.
  • Description
  • Fact Sheet
  • Availability**
  • Ratings (0)

Fact Sheet of Chris King R45 Rear Hub - Disc - QR 10x135mm - 32 Hole

Product Name: Chris King R45 Rear Hub - Disc - QR 10x135mm - 32 Hole
Manufacturer: Chris King
Item Code: CHK228631
Year: 2016
Material: Aluminium 2024 T6, stainless steel bearing
Weight: approx. 276 gram (manufacturer information)
Hole number: 32
Hub axle system: 135mm
Fitting for derailleur: Shimano / SRAM 8/9/10 | 11-speed
Disc Standard: 6-bolt
  • Description
  • Fact Sheet
  • Availability**
  • Ratings (0)
Chris King R45 Rear Hub - Disc - QR 10x135mm - 32 Hole
Delivery time 2-4 daysColor: black
Delivery time 2-4 daysColor: silver
Production, delivery time 8 weeksColor: red
Production, delivery time 8 weeksColor: navy
Production, delivery time 8 weeksColor: pewter
Production, delivery time 8 weeksColor: pink
Production, delivery time 8 weeksColor: mango
Production, delivery time 8 weeksColor: gold
Production, delivery time 8 weeksColor: green
  • Description
  • Fact Sheet
  • Availability**
  • Ratings (0)

Average:

(0 Ratings)
Customer Reviews